octatonic
May 15th, 2008, 01:22 PM
Every few months I tend to rewire the studio to some degree.
his time I have stripped everything out and done it from scratch again.
It is a really good idea if you have any degree of complexity.
All power and audio cables are cut to be the exact length +10-15% for slack.
All cables are tested, resoldered if required and I get rid of all the dust.
It does tend to get a bit messy... as you can see.
(I'm about 1/2 way through.)
his time I have stripped everything out and done it from scratch again.
It is a really good idea if you have any degree of complexity.
All power and audio cables are cut to be the exact length +10-15% for slack.
All cables are tested, resoldered if required and I get rid of all the dust.
It does tend to get a bit messy... as you can see.
(I'm about 1/2 way through.)
![$vboptions[bbtitle]](../../gifs/tdpr-headTRANS.gif)