The neck came in from Warmoth. I worked on the neck pocket template to get a nice fit then re-routed the neck pocket.
This is how it currently looks. I figure about 10 more coats of deft on the body then let it cure, and probably about the same on the neck, except what will be needed to seal in and level over the headstock decals. The temps here are running right at a hundred with sub-20% humidity, so I'm able to get 4 or 5 coats a day on when I'm home. Since I start a two week staycation this evening, I figure I should be able to buff and finish this puppy in about three weeks. Some times the heat is a good thing.
